2012-11-29 - 5452 - Research - DR - Investigate single order option #ProductionBreakFix #ProductionOrders

5452.100 - Research - DR - Investigate single order option

Description


DR - Investigate single order option.
Investigate single order option for DR production. Create a document on single order option to have one order with blanks as the component. The document should list all the Pros and Cons.

Admin Info


Purpose
Investigate single order option
Requested by
Rahul Attarde
Issue Date
11-29-2012
Resolved by
Adithya
Resolved Date
12-10-2012
Document Status
Complete

Purpose


Easy traceability of requirement to proposal. In the current scenario particularly for blanks in make to stock it is difficult to trace the proposals specific to requirement.

Advantages and Difficulties


Advantages:

Difficulties:
“If stock maintained for blank based on anticipating demand for FG, deliveries can be done short period compared to single order scenario”

Major Problems:

Current scenario and single order scenario



Current Scenario

Single Order Option

Master Data
Update production scheduling profile to exclude excess production from MRP consideration
No need for production scheduling profile.
BOM Maintenance
Multilevel BOM: The FG BOM components include Blank and Text items.
The Blank has the BOM with raw materials as components
The FG BOM components include the raw materials as components
Routing
FG and Blank both has different routing
Only FG has the Routing
Operation
FG Routing Include 5 operations: COMPONENTS FOR BLANKS, OVERHEAD LOW, SCREEN PRINT, HEAT TRANSFER, and PACKING
Blank Routing include 3 Operations: OVERHEAD, CUTTING, and SEWING.
There will be one Routing for FG Material combining the Blank and FG operations from current scenario. OVERHEAD, CUTTING, SEWING, SCREEN PRINTING, HEAT TRANSFER and PACKING.
Planning
The Planning is done for FG, Blanks and Raw materials, generating Proposals for FG, Blanks and Raw materials.
Planning is done for FG and Raw materials
External Sewing
External Operation is last operation in Blank Routing, with Alternative Sequence.
External Operation is included in FG Routing with the Alternative sequence.
External Operation
Auto MIGO is Possible
Auto MIGO is not possible
Development changes

Changes need to be done for Production Order form.
Blank Inventory
Blanks inventory exists
No Inventory for Blanks
Blank Stock Transfer
Stock transfer is possible to other plants from DR
No Stock transfer, as Blank material does not exist.
Pre Packs
Orders are generated for Pre-Pack material, FG material and Blank
Order is generated for FG material and Pre-Pack
Production Orders
Two
One
Process Strategy
Materials are shared between plants
Need to have two different strategies in 7410 and 1410.

Points to be discussed


Release Information


Provide link here to Release Notes